Installation

Installation

We provide complete package for installation. We also give design plan within the pump room that serves as a guide for installing the pumps. We also conduct survey and site visits in order to evaluate if the site is ready.

 Scope of Works

  • Site survey
  • Supply and on site delivery of pumps
  • Positioning and amounting of pumps on their designated location specified on the design plan.
  • Piping works for pumps from discharge platform
  • Wiring and termination between pump motor, terminals and pump controller. Brixton Corp. shall supply wiring materials for installation.
  • Start-up, testing and commissioning of pump
  • Orientation and training will be conducted by our expert technical engineering staff for proper handling of operation and maintenance of pumps.
  • Submission of Pump Operation Manual and other related technical data.
  • Proper Turn over